From: Laszlo Harsanyi <laszloha@gmail.com>
Date: Fri, Oct 14, 2016 at 1:05 PM
Subject: DRAFT Minutes of September HOA BOD Meeting
To: Laszlo Harsanyi <laszloha@gmail.com>

Dear Neighbors,

 

As discussed with homeowners at our June Board of Directors (BOD) meeting, I have attached the Draft minutes from our September meeting. These minutes will be reviewed and finalized at our October meeting and will be posted on our web site at www.derwoodstation2.com.

 

The BOD has partnered with the Rock Creek Conservancy (RCC) and supports their application to the Chesapeake Bay Trust for funding a conservation project in Common Area 2.  See my August Minutes distribution and the attached draft minutes..

 

“The primary goal of this project is to install conservation landscaping in a common area in the Derwood Station 2 community to reduce and manage stormwater runoff onsite before it reaches Crabbs Branch, a tributary of Rock Creek.  The project area, situated just uphill from Crabbs Branch, is significantly impacted by concentrated stormwater flow from a drainage pipe that collects runoff from the surrounding impervious areas, such as roofs of local homes, driveways, and the surrounding streets in the development, and discharges it into the grassy area.  Additional runoff is contributed to the site through surface flow from the surrounding area. A secondary goal for the completed project is to facilitate the education of local residents about stormwater and their connection to the Rock Creek watershed, and to serve as a demonstration site for other HOAs, institutions and organizations to learn about an effective and aesthetic approach to stormwater management.”

 

RCC met the application submission deadline. More information will be made available when the funding award is made in December or later.

 

Laszlo

 

László Harsányi

DSHOA2 President

7228 Titonka Way

301-569-6722 (home)

301-651-7596 (cell)